These Darien Streets Will Be Paved July 13-25

More
Traffic cone

by emijrp on Wikimedia Commons

Picture by emijrp on Wikimedia Commons

Download PDF

The Darien Department of Public Works has announced its repaving schedule for 2015, with these streets or parts of streets to be paved from mid to late July.

In addition to the list below, Walmsley Road is expected to be repaved after an Aquarion Water Co. line is replaced there, said Assistant Public Works Director Darren Oustafine.

Here’s the announcement from the Darien Department of Public Works:

The Town of Darien paving program for the summer of 2015 is as follows [Darienite has added links to Google or Google Maps showing where each street is or what portions of the street will be paved]:

STREET NAME

FROM

TO

START MILLING

FINISH

PAVING

Harriett Lane

Tokekene Road

cul de sac

July 13

July 17

Harriett Lane East

Harriett Lane

cul de sac

July 13

July 17

Old Kings Highway South

Locust Hill Road

Tokeneke Road

July 13

July 21

Overbrook Lane

Mansfield Avenue

Brookside Road

July 14

July 22

Noroton Avenue

Post Road

Hecker Avenue

July 15

July 23

Noroton Avenue

Heights Road

West Avenue

July 16

July 23

Hollow Tree Ridge Road

Post Road

Red Cedar Drive

July 17

July 24

Miles Road

Hollow Tree Ridge

Hollow Tree Ridge

July 21

July 25

Country Club Road

Hoyt Street

cul de sac

July 21

July 25

Preparatory work will precede paving on all of the above roads.  Dates listed above include milling and paving. Road surfaces will have raised structures during these dates.

Please avoid these roads if possible during these times or use extra caution if you must travel on these roads.  The above schedule is based on favorable weather conditions.  Emergency access will be available at all times.

Traffic coneTown of Darien police officers will be present to direct traffic and assist area residents during construction.

Driveway access will be limited during paving operations.  However, no single driveway should be closed for more than an hour.

On-street parking will be suspended during paving operations.  Minor traffic delays are likely.  Please plan your travels accordingly.

Please call the Department of Public Works at 656-7346 for further information.

One thought on “These Darien Streets Will Be Paved July 13-25

  1. Pingback: Noroton Ave/Heights Rd Intersection Closed Friday Morning for Paving | Darienite

Leave a Reply

Your email address will not be published. Required fields are marked *