State Transportation Department to Repave All of Post Road in Darien from Sept 14 to Oct 13

More
DOT

DOT

Connecticut Department of Transportation barrel

Download PDF

The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on a 3.81-mile section of Route 1 in Darien, Tuesday, Sept. 14, through Friday, Oct. 13, 2017. Work hours will be 8 p.m. to 5 a.m.

DOT

DOT

Connecticut Department of Transportation barrel

The project consists of milling and resurfacing the 3.81 miles of Route 1 in Darien.

an announcement from the Connecticut Department of Transportation

The milling segment of this project is anticipated to be performed on Thursday night, Sept. 14, through Friday morning, Oct. 6.  The resurfacing segment of this project is anticipated to be performed on Wednesday night, Sept. 27 through Friday morning, Oct. 13.

Lane Closure Info

Motorists can expect lane closures on Route 1 from .10 mile north of Stamford own line to Norwalk town line.  Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 8 p.m. to 5 a.m.  (Sunday through Thursday).

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.

One thought on “State Transportation Department to Repave All of Post Road in Darien from Sept 14 to Oct 13

  1. Pingback: Post Road Paving Resumes Sunday Night. Line-Painting Resumption? Still a Mystery - DarieniteDarienite

Leave a Reply

Your email address will not be published. Required fields are marked *