DPW Announces Paving of Parking Lots Between Tilley Pond Park and Post Rd

More
Tilley Parking Lots Darien Department of Public Works 910-27-16

Image from Darien Department of Public Works

Download PDF

The Town of Darien will be milling and repaving the town owned-portion of the Tilley Parking Lot from Tuesday, Nov. 8 to Thursday, Nov. 10. 

All vehicles must be removed from the parking area.  Residents and business owners may use Mechanic Street Parking Lot or Leroy West Parking Lot without being ticketed.

Work will be performed during the daytime hours of 7 a.m. to 5 p.m. on all days.  Preparatory work will precede paving in the parking lot area.  Dates listed above include milling and paving.

Tilley Parking Lots Darien Department of Public Works 910-27-16

Image from Darien Department of Public Works

Driving surfaces will have raised structures during these dates.  Please avoid this parking area if possible during these times or use extra caution if you use the parking area during these dates.

Your vehicle will be towed if left in the parking lot during the dates and times above.  The above schedule is based on favorable weather conditions.  Emergency access will be available at all times.

Darien DPW supervisors and employees will be present to direct traffic and assist area residents during construction as needed.  Driveway access will be limited during paving operations.  Please plan your parking needs accordingly.

Please call the Department of Public Works at 656-7346 for further information.

Leave a Reply

Your email address will not be published. Required fields are marked *